Mississippi Natural Gas Pipelines & Sawmills — Loa Carbon

Pipelines: U.S. EIA, Natural Gas Interstate and Intrastate Pipelines (ArcGIS Online, layer updated Dec 2025), accessed 2026-09-22. Clipped to state boundary. Approximate locations; not for siting or excavation.
Sawmills: Mississippi Forestry Commission directory and the Loa sawmill model (rebuilt 2026-10-08).
Loa sawmill model · Mississippi
Dot area = Nyx units = mill residue (green tonnes/yr) ÷ 43,000 green tonnes per unit (24,000 dry tonnes). Hover a dot for name, Nyx units, state rank and capital access.
Mill rows come from Loa_Sawmill_Model.xlsx and refresh every time the model is merged. State rank = the model's opportunity-score rank among that state's mills; unranked mills are not yet scored. Capacity is the model's figure and basis; a permit figure is a ceiling, not production. Location is the MFC directory point where the mill matches one, otherwise the town centre (the popup says which). Listed mills with a capacity but no model residue are sized with the model's own median residue per MMBF and say so in the popup. "Nearest line" is straight-line distance to EIA generalized pipeline geometry, ± a few miles.
Trucked-gas prospects · Mississippi
Industrial plants that truck in gas or burn oil / propane off-pipe — candidates for a Nyx at the fence. Diamond size = fuel use in Nyx-equivalent units (290,000 MMBtu each).
Source: Trucked Gas Prospects 2026-10-02 (EPA GHGRP RY2019–2023 fuel use). Every “possible” and “no gas line” site was then researched one by one (permits, utility filings, EPA fuel records, news) on 2 Oct 2026 — the popup says what we found, who supplies the fuel and links the source. Wood nearby = Loa_Sawmill_Model.xlsx: operating sawmills (site point, else town centre) and operating wood buyers from the Demand Census (pulp, pellet, panel, biomass power, charcoal; town centre). Distances are straight-line. Mill sizes are the model’s; small mills are mostly unsized.
Gas utility service territories
Source: HIFLD Natural Gas Service Territories (EIA-176 based, source dates 2015–2016), ArcGIS copy pulled 2 Oct 2026. Boundaries are approximate — often whole counties or town limits — so “inside” means the utility holds the franchise there, not that a main runs past the site.

Pipeline type

Gulf South (Boardwalk)
Tennessee Gas (Kinder Morgan)
Southern Natural (KM / Southern Co.)
Transco (Williams)
Texas Eastern (Enbridge)
Other pipelines
Interstate transmission — top operators
Intrastate transmission — top operators
Mileage = mapped miles from EIA generalized geometry (parallel loops counted separately); not PHMSA-reported mileage.
Local distribution mains are not in any public dataset (PHMSA NPMS and MARIS publish transmission only), so only transmission lines are shown.
MFC points: Mississippi Forestry Commission, 2025 MS Forest Products Companies (Forest Industry Directory feature service, edited 2025-07-08). The directory carries no open/closed status.
Receipt/delivery points and compressor stations: HIFLD/EIA Natural Gas Receipt Delivery Points (source 2015, validated 2016-2017) and Compressor Stations (2020), via ArcGIS Online mirror. Receipt = point where gas enters the pipeline; existing points show where third-party gas is already accepted.